    Concrete Quantity Calculator

    Calculate cement bags, sand, aggregate, and water for any concrete element

    Shape

    Mix ratio (cement : sand : aggregate)

    1:2:4 is the standard residential ratio; pick custom to enter your own parts.

    Cement bag size

    Typical: 5% for slabs, 10% for columns and stairs.

    Optional: unit prices (for total cost)

    Wet volume

    3m³

    Geometric volume of the element.

    Dry volume

    4.85m³

    Wet × (1 + wastage) × 1.54 — what you order.

    Cement bags

    20bags

    997.92 kg

    Sand

    1.39m³

    Aggregate

    2.77m³

    Water

    498.96L
    Save your time

    Do this every day? Snad automates it for you.

    • Accounting, inventory and invoicing on one database
    • Calculations run automatically — no separate calculators
    • A 7-day trial · no credit card
    No credit card · 7 days free

    How does it work?

    The concrete calculator converts the geometric volume of a structural element into the bill of materials a foreman actually orders: cement bags, sand, and coarse aggregate. The wet volume is the physical space the concrete occupies; multiplying by (1 + wastage) builds in a buffer for spillage and over-pours; multiplying by 1.54 produces the dry volume — the industry-standard factor that accounts for the voids between dry aggregate particles before water reduces them. The dry volume is then split between the three components according to the mix ratio you select. Cement weight comes from the cement volume × 1440 kg/m³ density, and water is fixed at the standard 0.5 water-cement ratio.

    Core formula

    Each shape has its own wet-volume formula. After that the pipeline is identical: apply wastage, scale to dry volume, split by mix ratio, convert cement volume to bags.

    Dry Volume = Wet × (1 + Wastage%) × 1.54 | Cement = Dry × cementPart/totalParts | Cement Bags = ⌈Cement × 1440 / BagSize⌉

    Worked example — a 5 × 4 m slab, 15 cm thick

    Inputs: shape = slab, length = 5 m, width = 4 m, thickness = 0.15 m, mix = 1:2:4, wastage = 5%, bag size = 50 kg.

    1. Wet volume = 5 × 4 × 0.15 = 3.00 m³
    2. With wastage = 3.00 × 1.05 = 3.15 m³
    3. Dry volume = 3.15 × 1.54 = 4.85 m³
    4. Cement share = 1 / (1+2+4) = 0.143 → cement volume = 4.85 × 0.143 = 0.693 m³
    5. Cement weight = 0.693 × 1440 = 998 kg → 998 / 50 = 19.96 → 20 bags
    6. Sand = 4.85 × 2/7 = 1.39 m³, aggregate = 4.85 × 4/7 = 2.77 m³, water = 0.5 × 998 = 499 L

    Common mistakes to avoid

    • Confusing wet and dry volumes — always order from the dry volume, not the cast-in-place figure.
    • Using wastage 0% on irregular pours — 5–10% is the safe range for most slabs; up to 15% for columns and stairs.
    • Treating the stairs formula as exact — it uses the standard waist-slab approximation; spiral or curved stairs need a manual breakdown.
    • Forgetting that bagged cement comes in two sizes — a 25 kg bag count is roughly double the 50 kg count for the same volume.

    Practical tips

    • A 1:2:4 ratio is the most common general-purpose mix in residential work, and 1:1.5:3 is used for structural elements carrying higher loads — take the ratio from your project specification, not from custom.
    • Cement bags ship at different weights between markets (25, 40 and 50 kg are all common), so enter the weight printed on the bag: assuming the wrong one shifts the bag count by a third.
    • Add 5–10% to the calculated volume for losses in transport, pouring and levelling.
    • Hand mixing is less consistent than ready-mix; for anything beyond a few cubic metres, price ready-mix before deciding.

    Frequently Asked Questions

    Related Tools

    Discover more free Snad tools

    Dozens of free tools to manage your business smarter — all in one place.

    See every calculator

    Worth knowing beforehand

    Not seeing your question? Write to us

    Switch on what you need today

    Open the account and start the same day — no setup fee and no implementation team.

    Pricing
    Chat with us