Construction
Tile & Ceramic Calculator
Compute tile count, boxes, and grout needed for any floor or wall area
- Free
- No Signup
- Calculated in your browser
Tile size (cm)
Square presets; switch to custom for rectangular tiles like 30 × 60.
10% straight-laid, 15% diagonal, 20% herringbone.
Optional: prices
Total area
Total tiles
Includes wastage; always rounded up.
Total boxes
Grout needed
Based on 0.4 kg/m² for 3 mm joints.
How does it work?
The tile calculator answers the single question every renovation starts with: how many tiles do I buy? Divide the room area by the tile area, add a wastage allowance (always round up — you can't return half a tile), then divide by the tiles-per-box count to get a purchase order. The grout estimate uses the manufacturer-published average of 0.4 kg per square metre for 3 mm joints — wider joints or larger format tiles need a higher coefficient.
Core formula
Convert tile dimensions to square metres, divide the room area by that figure, and bump up by wastage.
Total Tiles = ⌈(Room Area ÷ Tile Area) × (1 + Wastage%)⌉ | Boxes = ⌈Total Tiles ÷ Tiles per Box⌉ | Grout (kg) = Area × 0.4
Worked example — a 4 × 3 m room with 60 × 60 cm tiles
Inputs: area = 4 × 3 m, tile = 60 × 60 cm, wastage = 10%, tiles per box = 4.
- Room area = 4 × 3 = 12 m²
- Tile area = 0.60 × 0.60 = 0.36 m²
- Exact tiles = 12 / 0.36 = 33.33
- With wastage = 33.33 × 1.10 = 36.67 → ceil = 37 tiles
- Total boxes = ⌈37 / 4⌉ = 10 boxes
- Grout = 12 × 0.4 = 4.8 kg
Common mistakes to avoid
- Using 0% wastage on a real installation — even straight cuts produce offcuts; the safe minimum is 5–10%.
- Confusing tile dimensions in centimetres vs millimetres — 60 mm and 60 cm differ by a factor of 100.
- Ignoring patterns — diagonal layouts and herringbone need 15–20% wastage instead of 10%.
- Mixing batches — order all the tiles in one purchase to avoid colour-lot drift.
Tips for accurate estimates
- Buy one extra box for future repairs — discontinued tile lines are common.
- For L-shaped or irregular rooms, calculate each rectangle separately and add them.
- Wall tiles typically need less grout than floors because joints are tighter.
- Always confirm tiles-per-box with the supplier — it varies by brand and size.
Frequently Asked Questions
What wastage percentage should I use?
Use 10% for standard straight-laid tiles, 15% for diagonal layouts, and 20% for herringbone or other complex patterns. Smaller rooms need a higher percentage because cuts are proportionally larger.
Why does the calculator always round up?
Tiles are sold whole, not by the square metre. If the math says 33.33 tiles, you must buy 34 — there's no half-tile option at the supplier.
Is the 0.4 kg/m² grout estimate accurate?
It's the manufacturer-published average for 3 mm joints with standard cement-based grout. Wider joints (5 mm or more) need a higher coefficient.
Can I use this for outdoor or porcelain tiles?
Yes — the math is the same. Outdoor installations often use larger formats and may need more wastage for cuts around drains and slopes.
What about rectangular tiles (e.g. 30 × 60)?
Pick the custom option and enter both dimensions. The math handles any rectangle.
Should I include skirting and trim tiles?
No — this calculator covers the field tiles only. Estimate skirting separately (linear metres of room perimeter ÷ trim length).
How do I price per box vs per tile?
If you fill the price-per-box field, the calculator uses it (closer to how tiles are sold). Otherwise it falls back to price-per-tile × total tile count.
What if my supplier sells loose tiles?
Set tiles-per-box to 1 — every tile counts as its own box. The total box count will then equal the total tile count.
From the same drawer
Everything in Construction- Concrete Quantity CalculatorCalculate cement bags, sand, aggregate, and water for any concrete element
- Paint Quantity CalculatorCompute litres and buckets of paint plus primer for any room
- Construction Quote GeneratorBuild a construction quote PDF with line items and totals
- Construction Labor & Duration CalculatorEstimate working days, calendar days, and total labour cost for any construction job
When you run the same sum every day
Invoicing every day? In Snad each invoice posts its entry and updates your stock automatically.
Free plan, no end date · 7-day trial, no card
- Accounting, inventory and ZATCA e-invoicing in the same software
- Tax and balances are computed from your own transactions, so no figure moves to a separate spreadsheet