Construction Labor & Duration Calculator

Estimate working days, calendar days, and total labour cost for any construction job

Construction Labor & Duration Calculator
  • Free
  • No Signup
  • Calculated in your browser

Total units of work (m², m³, pieces — unit-agnostic).

Units per worker per day. Tile ≈ 10 m², paint ≈ 25 m², block work ≈ 6 m².

Standard Saudi weekly rest day.

~15 paid Saudi public holidays per year.

Working days

10days

Calendar days

13days

Adjusted for Fridays and public holidays.

Output per day

50

Estimated completion

11/12/2026

Total labour cost

7,500SAR

How does it work?

The labour and duration calculator answers the foreman's first scheduling question: with this many workers at this productivity rate, when does the job finish? Multiplying the productivity rate (units per worker per day) by the workforce size gives the daily output. Dividing the total work volume by daily output and rounding up gives the working days. Calendar days are then adjusted: Saudi sites typically rest Friday, so working days × 7/6 captures the lost day per week; an additional ~4% accounts for the ~15 paid public holidays per year (Eid Al-Fitr, Eid Al-Adha, National Day, Founding Day). Total cost is straightforward: working days × workers × daily wage.

Core formula

Productivity per day determines working days; calendar days adjust for rest days and holidays; cost scales with workers and wage.

Working Days = ⌈Volume ÷ (Rate × Workers)⌉ | Calendar Days = Working × 7/6 (Fri) × (1 + 15/365) (Holidays) | Cost = Working × Workers × Wage

Worked example — 500 m² of tile laying

Inputs: work volume = 500 m², productivity rate = 10 m²/worker/day, workers = 5, daily wage = 150 SAR, exclude Fridays = yes, exclude holidays = yes.

  1. Productivity per day = 10 × 5 = 50 m²/day
  2. Working days = ⌈500 / 50⌉ = 10 days
  3. Calendar (Fri adj.) = 10 × 7/6 = 11.67 days
  4. Calendar (holidays adj.) = 11.67 × (1 + 15/365) = 12.15 → ⌈⌉ = 13 days
  5. Total labour cost = 10 × 5 × 150 = 7,500 SAR
  6. If start = today, completion ≈ today + 12 days

Common mistakes to avoid

  • Quoting calendar days as if they were working days — confuses the client and shortens the perceived schedule.
  • Using an over-optimistic productivity rate — site reality is usually 70–80% of textbook figures.
  • Forgetting that some holidays overlap with Fridays — the multipliers are independent and slightly overcount when they do.
  • Not adjusting for inexperienced labour — first-time workers run at 50–60% of standard rates for the first week.

Tips for accurate estimates

  • Saudi standard rates per worker per 8-hour day: tile laying 8–12 m², painting 25–30 m², block work 6–8 m².
  • Add a 10–15% schedule buffer for site disruptions (rain, deliveries, inspections).
  • When pricing for the client, quote calendar days plus a 10% buffer — round up to the nearest week.
  • Track actual productivity on the first few days and re-baseline the estimate.

Frequently Asked Questions

Why are calendar days bigger than working days?

Working days are pure 'productive on-site' days. Calendar days include weekly rest (Friday in Saudi practice) and paid public holidays — they represent the time on the wall calendar, which is what the client sees.

Are the calendar-day multipliers exact?

They're approximations. The Friday multiplier (7/6) is exact for a 6-on-1-off rotation; the holiday multiplier (1 + 15/365) assumes ~15 paid public holidays evenly spread. When the two overlap the calculator slightly overcounts — safer than under-counting.

Where do the standard productivity rates come from?

They're industry averages from construction estimating handbooks. Tile laying ≈ 10 m²/worker/day, painting ≈ 25 m²/worker/day, block work ≈ 6 m²/worker/day are typical Saudi figures.

Does this account for Ramadan working hours?

No — during Ramadan most Saudi construction sites operate 6 hours instead of 8. Multiply your productivity rate by 0.75 to compensate.

Can I model multiple trades?

Run the calculator once per trade and add the durations. For overlapping trades on the same critical path use the longer estimate plus a small buffer.

What if I add more workers?

The relationship is linear: doubling the workforce halves the working days. In practice large crews suffer coordination overhead. Stay realistic above 10 workers per trade.

Is the daily wage gross or net?

The calculator uses whatever number you enter — typically the gross daily wage including GOSI and accommodation allowances. For accurate cost-to-company use the fully-loaded figure.

Why does the completion date sometimes look off?

The date arithmetic is pure Gregorian: start date + (calendar days − 1). It doesn't skip weekends — those are already baked into the calendar-days adjustment.

When you run the same sum every day

Invoicing every day? In Snad each invoice posts its entry and updates your stock automatically.

Free plan, no end date · 7-day trial, no card

  • Accounting, inventory and ZATCA e-invoicing in the same software
  • Tax and balances are computed from your own transactions, so no figure moves to a separate spreadsheet